Phone: 661-568-9170 or Fax: 661-885-8185

Pump Rebuilds and Upgrades

Pump Rebuild Process

Lee Power Steering Pump Rebuilds

First, we completely disassemble your pump and visually inspect all parts. Then it is run through a hot tank washing cycle. The piston, rotor and vanes are all precisely measured. If anything is out or tolerance, we install a complete new cam pack in your pump. The pump is re-assembled using all new o-rings and seals. Once assembled, the pump is tested at the pressure and flow rate that is needed for your application. It is then stamped with a serial number for our records and finally, we box it up and ship back to you.

Pump rebuild: $160.00*
*Pump rebuild pricing is a starting estimate that includes soft parts (O-rings and seals). You will receive a firm quote once our technicians disassemble your components and inspect all hard parts.